Home MenuPenton Rd Drainage Project
The removal of the existing pipe. The Special Projects Crew worked with a local gas company to move the existing gas line to install the new, bigger cross pipe. See the gas line at the end of the opening of the existing pipe.
Removal old pipe
Replacing new, bigger cross pipe
Connecting two joints of cross pipe with a band
Road open with new cross pipe installed.